Research on Planning and Control of Power Grid ProjectConstruction Project Under the Constraint of Time Limit
Author(s):
Li Ayong
Donlinks School of Economics and Management,University of Science and Technology Beijing,Beijing 100083,China
Keywords:
project demand plan power grid project BFOA
PACS:
F224
DOI:
-
Abstract:
For power grid construction project plan formulation and control problem,the paper discusses the in-time limit for a project with constraints,and strives to resources balanced consumption problem. On the basis of the traditional resource leveling optimization method,the paper puts forward the reasonable using bacterial foraging algorithm solving the resource balance optimization problems,and designs the corresponding algorithm process,and examples of simulation calculation show that bacterial foraging algorithm can be used to calculate the equilibrium optimization construction process.

References:

[1] ANDERSEN H B,GARDE H,ANDERSEN V. MMS:an electronic message management system for emergency response[J]. IEEE transactions on engineering management,1998,45(2):132-140.
[2] MENG X,SUN M,JONES M. Maturity model for supply chain relationships in construction[J]. Journal of management in engineering,2011,27(2):97-105.
[3] 刘颖. 大物流工程项目类制造系统及其资源优化配置技术的研究[D]. 重庆:重庆大学,2001.
LIU Y. Research on the manufacturing system of large logistics engineering project and its resource optimization[D]. Chongqing:Chongqing University, 2001.(in Chinese)
[4] FREELAND J R,MOORE J H. Implications of resource directive allocation models for organizational design[J]. Management science,1977,23(10):1 050-1 059.
[5] LEU S,CHEN A,YANG C. A GA-based fuzzy optimal model for construction time-cost trade-off[J]. International journal of project management,2001,19(1):47-58.
[6] LEU Y,RAKES T R,REES L P,et al. Modelling resource allocation in a decentralized organization with an AI-based,goal-directive model[J]. Decision sciences,1992,23(5):1 027-1 049.
[7] SEARS C. 建筑项目管理[M]. 北京:机械工业出版社,2004.
SEARS C. Architecture project administration[M]. Beijing:China Machine Press,2004.(in Chinese)

Memo

Memo:
-
Last Update: 2016-03-20