Investigation on the Generation Cost of Combined Cycle Power Plant Based on the Structural Theory of Thermoeconomics(PDF)

南京师范大学学报(工程技术版)[ISSN:1006-6977/CN:61-1281/TN]

Issue:
2013年03期
Page:
32-39
Research Field:
Publishing date:

Info

Title:
Investigation on the Generation Cost of Combined Cycle Power Plant Based on the Structural Theory of Thermoeconomics
Author(s):
Zhang Yuwei1Zhao Chun2Li Yinglin1
1.School of Energy and Mechanical Engineering,Nanjing Normal University,Nanjing 210042,China) (2.Key Laboratory of Energy Thermal Conversion and Control of Ministry of Education,School of Energy and Environment, Southeast University,Nanjing 210096,China
Keywords:
combined cycle power plantthermoeconomicheat recovery steam generatorgeneration cost
PACS:
TK261
DOI:
-
Abstract:
Along with the completion of the “West-East” project in China,as well as the construction of the “gas transmission from Sichuan province to eastern provinces” and the further development of gas in East China Sea,combined cycle power plants(CCPPs)have been developed quickly in the past couple of years.The traditional evaluation method based on the first and second law of thermodynamics does not consider the influence of non-energy cost.Firstly,the cost model of CCPP is established based on the thermoeconomic structural theory.Secondly,considering the importance of internal parameters,two internal parameters,such as compressor pressure ratio and the outlet temperature of gas turbine, are selected and investigated when designing the CCPP.Lastly,considering regional difference and seasonal difference,the way how the natural gas price change and environment temperature influence on the CCPP’s generating cost are studied respectively.These researches will support the thermoeconomic optimization of CCPP and provide a reference for investors or policy makers.

References:

[1] 徐清.燃气-蒸汽联合循环机组整体性能保证方式探讨[J].中国电机工程学报,2007,27(z1):70-74.
Xu Qing.Ways about guarantee performance of gas-steam combined cycle[J].Proceedings of the CSEE,2007,27(z1):70-74.(in Chinese)
[2]赵贺凯,申哲巍,孙东海,等.燃气-蒸汽联合循环发电成本分析[J].应用能源技术,2011(11):26-28.
Zhao Hekai,Shen Zhewei,Sun Donghai,et al.Electricity generating cost for the gas-steam combined cycle[J].Applied Energy Technology,2011(11):26-28.(in Chinese)
[3]芶建兵,倪维斗,李政,等.余热锅炉可视化模块建模研究[J].清华大学学报:自然科学版,1999(3):121-124.
Gou Jianbing,Ni Weidou,Li Zheng,et al.Visual modular modeling of heat recovery steam generators[J].Journal of Tsinghua University:Science and Technology,1999(3):121-124.(in Chinese)
[4]崔凝,王兵树,高建强,等.大容量余热锅炉动态模型的研究与应用[J].中国电机工程学报,2006,26(19):103-109.
Cui Ning,Wang Bingshu,Gao Jianqiang,et al.Study and application on an dynamic model for the large capacity heat recovery steam generator[J].Proceedings of the CSEE,2006,26(19):103-109.(in Chinese)
[5]冯志兵,崔平.联合循环中的余热锅炉[J].燃气轮机技术,2003,16(3):26-33.
Feng Zhibing,Cui Ping.Heat recovery steam generator in combined circle[J].Gas Turbine Technology,2003,16(3):26-33.(in Chinese)
[6]黄文波,林汝谋,肖云汉,等.联合循环中余热锅炉及其热力特性分析[J].燃气轮机技术,1996,9(4):21-30.
Huang Wenbo,Lin Rumou,Xiao Yunhan,et al.Heat recovery steam generator in combined circle and its thermal characteristics analysis[J].Gas Turbine Technology,1996,9(4):21-30.(in Chinese)
[7]岳伟挺,李素芬.联合循环余热锅炉蒸汽参数的优化分析[J].动力工程,2002,22(6):2 064-2 066.
Yue Weiting,Li Sufen.Optimization and analysis of steam parameters for heat recovery steam generator in combined circle[J].Power Engineering,2002,22(6):2 064-2 066.(in Chinese)
[8]Ghazi M,Ahmadi P,Sotoodeh A F,et al.Modeling and thermo-economic optimization of heat recovery heat exchangers using a multimodal genetic algorithm[J].Energy Conversion and Management,2012,58:149-156.(in Chinese)
[9]姚秀平.燃气轮机及其联合循环发电[M].北京:中国电力出版社,2004:45-50.
Yao Xiuping.Gas Turbine and Combined Cycle Power Generation[M].Beijing:China Electric Power Press,2004:45-50.(in Chinese)
[10]Franco Alessandro,Casarosa Claudio.On some perspectives for increasing the efficiency of combined cycle power plants[J].Applied Thermal Engineering,2002,22(13):1 501-1 518.
[11]陈盈盈,向文国,丁立旗.9FA型燃气轮机联合循环性能研究[J].燃气轮机技术,2006,19(2):21-24,29.
Chen Yingying,Xiang Wenguo,Ding Liqi.The performance study of 9FA gas turbine combined cycle[J].Gas Turbine Technology,2006,19(2):21-24,29.(in Chinese)
[12]Valero Antonio,Correas Luis,Zaleta Alejandro,et al.On the thermoeconomic approach to the diagnosis of energy system malfunctions:Part 1:the TADEUS problem[J].Energy,2004,29(12-15):1 875-1 887.
[13]Uche Javier,Serra Luis,Valero Antonio.Thermoeconomic optimization of a dual-purpose power and desalination plant[J].Desalination,2001,136(1-3):147-158.
[14]Zhang Chao,Chen Sheng,Zheng Chuguang,et al.Thermoeconomic diagnosis of a coal fired power plant[J].Energy Conversion and Management,2007,48(2):405-419.
[15]Deng Jian,Wang Ruzhu,Wu Jingyi,et al.Exergy cost analysis of a micro-trigeneration system based on the structural theory of thermoeconomics[J].Energy,2008,33(9):1 417-1 426.
[16]Valero Antonio,Lerch Felix,Serra Luis,et al.Structural theory and thermoeconomic diagnosis:Part Ⅱ:Application to an actual power plant[J].Energy Conversion and Management,2002,43(9-12):1 519-1 535.
[17]王清照,肖卫杰,王加璇.运用热经济学结构理论进行故障诊断的探讨[J].中国电机工程学报,2003,23(9):178-181.
Wang Qingzhao,Xiao Weijie,Wang Jiaxuan.An inquiry into the application of the structural theory for diagnosing malfunction in a thermal system[J].Proceedings of the CSEE,2003,23(9):178-181.(in Chinese)
[18]阎洪波,刘艳芳.燃气-蒸汽联合循环系统设计中热力参数的选择[J].汽轮机技术,2003,45(4):198-199,202.
Yan Hongbo,Liu Yanfang.Choose of thermal parameters in gas-steam combine circle system design[J].Turbine Technology,2003,45(4):198-199,202.(in Chinese)

Memo

Memo:
-
Last Update: 2013-09-30