参考文献/References:
[1] 徐清.燃气-蒸汽联合循环机组整体性能保证方式探讨[J].中国电机工程学报,2007,27(z1):70-74.
Xu Qing.Ways about guarantee performance of gas-steam combined cycle[J].Proceedings of the CSEE,2007,27(z1):70-74.(in Chinese)
[2]赵贺凯,申哲巍,孙东海,等.燃气-蒸汽联合循环发电成本分析[J].应用能源技术,2011(11):26-28.
Zhao Hekai,Shen Zhewei,Sun Donghai,et al.Electricity generating cost for the gas-steam combined cycle[J].Applied Energy Technology,2011(11):26-28.(in Chinese)
[3]芶建兵,倪维斗,李政,等.余热锅炉可视化模块建模研究[J].清华大学学报:自然科学版,1999(3):121-124.
Gou Jianbing,Ni Weidou,Li Zheng,et al.Visual modular modeling of heat recovery steam generators[J].Journal of Tsinghua University:Science and Technology,1999(3):121-124.(in Chinese)
[4]崔凝,王兵树,高建强,等.大容量余热锅炉动态模型的研究与应用[J].中国电机工程学报,2006,26(19):103-109.
Cui Ning,Wang Bingshu,Gao Jianqiang,et al.Study and application on an dynamic model for the large capacity heat recovery steam generator[J].Proceedings of the CSEE,2006,26(19):103-109.(in Chinese)
[5]冯志兵,崔平.联合循环中的余热锅炉[J].燃气轮机技术,2003,16(3):26-33.
Feng Zhibing,Cui Ping.Heat recovery steam generator in combined circle[J].Gas Turbine Technology,2003,16(3):26-33.(in Chinese)
[6]黄文波,林汝谋,肖云汉,等.联合循环中余热锅炉及其热力特性分析[J].燃气轮机技术,1996,9(4):21-30.
Huang Wenbo,Lin Rumou,Xiao Yunhan,et al.Heat recovery steam generator in combined circle and its thermal characteristics analysis[J].Gas Turbine Technology,1996,9(4):21-30.(in Chinese)
[7]岳伟挺,李素芬.联合循环余热锅炉蒸汽参数的优化分析[J].动力工程,2002,22(6):2 064-2 066.
Yue Weiting,Li Sufen.Optimization and analysis of steam parameters for heat recovery steam generator in combined circle[J].Power Engineering,2002,22(6):2 064-2 066.(in Chinese)
[8]Ghazi M,Ahmadi P,Sotoodeh A F,et al.Modeling and thermo-economic optimization of heat recovery heat exchangers using a multimodal genetic algorithm[J].Energy Conversion and Management,2012,58:149-156.(in Chinese)
[9]姚秀平.燃气轮机及其联合循环发电[M].北京:中国电力出版社,2004:45-50.
Yao Xiuping.Gas Turbine and Combined Cycle Power Generation[M].Beijing:China Electric Power Press,2004:45-50.(in Chinese)
[10]Franco Alessandro,Casarosa Claudio.On some perspectives for increasing the efficiency of combined cycle power plants[J].Applied Thermal Engineering,2002,22(13):1 501-1 518.
[11]陈盈盈,向文国,丁立旗.9FA型燃气轮机联合循环性能研究[J].燃气轮机技术,2006,19(2):21-24,29.
Chen Yingying,Xiang Wenguo,Ding Liqi.The performance study of 9FA gas turbine combined cycle[J].Gas Turbine Technology,2006,19(2):21-24,29.(in Chinese)
[12]Valero Antonio,Correas Luis,Zaleta Alejandro,et al.On the thermoeconomic approach to the diagnosis of energy system malfunctions:Part 1:the TADEUS problem[J].Energy,2004,29(12-15):1 875-1 887.
[13]Uche Javier,Serra Luis,Valero Antonio.Thermoeconomic optimization of a dual-purpose power and desalination plant[J].Desalination,2001,136(1-3):147-158.
[14]Zhang Chao,Chen Sheng,Zheng Chuguang,et al.Thermoeconomic diagnosis of a coal fired power plant[J].Energy Conversion and Management,2007,48(2):405-419.
[15]Deng Jian,Wang Ruzhu,Wu Jingyi,et al.Exergy cost analysis of a micro-trigeneration system based on the structural theory of thermoeconomics[J].Energy,2008,33(9):1 417-1 426.
[16]Valero Antonio,Lerch Felix,Serra Luis,et al.Structural theory and thermoeconomic diagnosis:Part Ⅱ:Application to an actual power plant[J].Energy Conversion and Management,2002,43(9-12):1 519-1 535.
[17]王清照,肖卫杰,王加璇.运用热经济学结构理论进行故障诊断的探讨[J].中国电机工程学报,2003,23(9):178-181.
Wang Qingzhao,Xiao Weijie,Wang Jiaxuan.An inquiry into the application of the structural theory for diagnosing malfunction in a thermal system[J].Proceedings of the CSEE,2003,23(9):178-181.(in Chinese)
[18]阎洪波,刘艳芳.燃气-蒸汽联合循环系统设计中热力参数的选择[J].汽轮机技术,2003,45(4):198-199,202.
Yan Hongbo,Liu Yanfang.Choose of thermal parameters in gas-steam combine circle system design[J].Turbine Technology,2003,45(4):198-199,202.(in Chinese)