工期约束下的电网工程建设项目计划制定与控制研究
分享到:

南京师范大学学报(工程技术版)[ISSN:1006-6977/CN:61-1281/TN]

卷:
16卷
期数:
2016年01期
页码:
089
栏目:
管理工程
出版日期:
2016-03-31

文章信息/Info

Title:
Research on Planning and Control of Power Grid ProjectConstruction Project Under the Constraint of Time Limit
作者:
李阿勇
北京科技大学东凌经济管理学院,北京 100083
Author(s):
Li Ayong
Donlinks School of Economics and Management,University of Science and Technology Beijing,Beijing 100083,China
关键词:
项目需求计划电网工程项目细菌觅食算法
Keywords:
project demand plan power grid project BFOA
分类号:
F224
文献标志码:
A
摘要:
针对电网工程建设项目计划制定和控制问题,讨论了在工期有限制条件下,力求资源均衡地消耗问题. 在传统资源均衡优化方法的基础上,提出了合理使用细菌觅食算法解决资源均衡优化问题的方法,并设计了相应的算法过程.实例模拟计算表明,利用细菌觅食算法可求得均衡性更优化的施工过程.
Abstract:
For power grid construction project plan formulation and control problem,the paper discusses the in-time limit for a project with constraints,and strives to resources balanced consumption problem. On the basis of the traditional resource leveling optimization method,the paper puts forward the reasonable using bacterial foraging algorithm solving the resource balance optimization problems,and designs the corresponding algorithm process,and examples of simulation calculation show that bacterial foraging algorithm can be used to calculate the equilibrium optimization construction process.

参考文献/References:

[1] ANDERSEN H B,GARDE H,ANDERSEN V. MMS:an electronic message management system for emergency response[J]. IEEE transactions on engineering management,1998,45(2):132-140.
[2] MENG X,SUN M,JONES M. Maturity model for supply chain relationships in construction[J]. Journal of management in engineering,2011,27(2):97-105.
[3] 刘颖. 大物流工程项目类制造系统及其资源优化配置技术的研究[D]. 重庆:重庆大学,2001.
LIU Y. Research on the manufacturing system of large logistics engineering project and its resource optimization[D]. Chongqing:Chongqing University, 2001.(in Chinese)
[4] FREELAND J R,MOORE J H. Implications of resource directive allocation models for organizational design[J]. Management science,1977,23(10):1 050-1 059.
[5] LEU S,CHEN A,YANG C. A GA-based fuzzy optimal model for construction time-cost trade-off[J]. International journal of project management,2001,19(1):47-58.
[6] LEU Y,RAKES T R,REES L P,et al. Modelling resource allocation in a decentralized organization with an AI-based,goal-directive model[J]. Decision sciences,1992,23(5):1 027-1 049.
[7] SEARS C. 建筑项目管理[M]. 北京:机械工业出版社,2004.
SEARS C. Architecture project administration[M]. Beijing:China Machine Press,2004.(in Chinese)

备注/Memo

备注/Memo:
收稿日期:2015-11-16. 
通讯联系人:李阿勇,博士研究生,研究方向:项目管理,优化理论. E-mail:tepcliayong@126.com
doi:10.3969/j.issn.1672-1292.2016.01.015
更新日期/Last Update: 2016-03-20