[1]徐 海,耿 路,高 翔,等.高铁自动过分相过电压机理与抑制方法研究[J].南京师范大学学报(工程技术版),2017,17(03):029.[doi:10.3969/j.issn.1672-1292.2017.03.005]
 Xu Hai,Geng Lu,Gao Xiang,et al.Research on Auto-Passing Phase Separation Overvoltage Mechanismand Suppression Method of High-Speed EMU[J].Journal of Nanjing Normal University(Engineering and Technology),2017,17(03):029.[doi:10.3969/j.issn.1672-1292.2017.03.005]
点击复制

高铁自动过分相过电压机理与抑制方法研究
分享到:

南京师范大学学报(工程技术版)[ISSN:1006-6977/CN:61-1281/TN]

卷:
17卷
期数:
2017年03期
页码:
029
栏目:
电气与电子工程
出版日期:
2017-09-30

文章信息/Info

Title:
Research on Auto-Passing Phase Separation Overvoltage Mechanismand Suppression Method of High-Speed EMU
文章编号:
1672-1292(2017)03-0029-10
作者:
徐 海1耿 路2高 翔2颜 伟2王恩荣2冶小刚2
(1.江苏科能电力工程咨询有限公司,江苏 南京 210036)(2.南京师范大学电气与自动化工程学院,江苏 南京 210046)
Author(s):
Xu Hai1Geng Lu2Gao Xiang2Yan Wei2Wang Enrong2Ye Xiaogang2
(1.Jiangsu Keneng Electric Power Engineering Consulting Co.,Ltd.,Nanjing 210036,China)(2.School of Electrical and Automation Engineering,Nanjing Normal University,Nanjing 210042,China)
关键词:
牵引变压器静态过电压牵引传动系统RC吸收法自动准同期装置
Keywords:
traction transformerstatic overvoltagetraction drive
分类号:
TB95
DOI:
10.3969/j.issn.1672-1292.2017.03.005
文献标志码:
A
摘要:
高铁通过电分相时,主断路器切断动作会产生牵引变压器过电压,对牵引网及车载设备具有较大危害. 分析了CRH2型动车组过分相时产生过电压的机理,利用SIMULINK建立了动车组牵引传动系统模型,研究了高铁过分相运行状态及电路特性,提出基于RC吸收法治理措施及其优化参数设计. 同时,还研究了合闸电压初相角对过电压的影响,提出了基于自动准同期装置控制合闸相位角的过电压治理方案,为高铁过分相时牵引变压器过电压的抑制提供了理论依据与工程指导.
Abstract:
The overvoltage of the traction transformer is generated due to the cut on or off operation of the main circuit breaker,when high speed train passes the neutral section. It has a great harm on the power systems and other trains. The overvoltage mechanism is analyzed due to CRH2 electric multiple units passing the neutral section. The traction drive system models are established on the basis of SIMULINK for CRH2 electric multiple units. The operation performance and circuit characteristics are studied. The overvoltage treatment scheme is introduced on the basis of the RC absorption and its parameter optimization strategy is proposed. Moreover,the relationship between the voltage phase and overvoltage is analyzed while CRH2 electric multiple units passing the neutral section. The automatic quasi synchronization device is proposed to control the voltage phase and decrease the overvoltage,which provides the theoretical basis and engineering guidance to solve the overvoltage and increases the safety and reliability of high speed train operation.

参考文献/References:

[1] DáN D,PéTER K. Effect on power quality of the high power electric traction[J]. Electric utility deregulation and restructuring and power technologies,2006,1(4):138-143.
[2]张雪原. 高速重载铁路车网耦合下过电压产生机理与防护方法研究[D]. 成都:西南交通大学,2009.
ZHANG X Y. Research on overvoltage mechanism and prevention in the network-locomotive coupling of the high speed and heavy haul railways[D]. Chengdu:Southwest Jiaotong University,2009.(in Chinese)
[3]丰战凯. 电气化铁路过电压产生的原因及对策[J]. 两铁科技,2007(2):16-18.
FENG Z K. Causes and countermeasures of over voltage of electrified railway[J]. Two iron technology,2007(2):16-18.(in Chinese)
[4]赵峰,张泰伟,张忠. 接触网关节式电分相过电压的研究[J]. 兰州交通大学学报,2009,28(1):52-55.
ZHAO F,ZHANG T W,ZHANG Z. Research on over-voltage of the articulated phase insulator on overhead contact system[J]. Journal of Lanzhou jiaotong university,2009,28(1):52-55.(in Chinese)
[5]陈朝珍. 电力机车过电分相电气过程的机理分析[D]. 成都:西南交通大学,2007.
CHEN C Z. Mechanism analysis of electric locomotive passing through phase separation[D]. Chengdu:Southwest Jiaotong University,2007.(in Chinese)
[6]马德明,高仕斌. 断电过电分相的过电压暂态过程分析[J]. 电气化铁道,2008(3):1-4.
MA D M,GAO S B. Over voltage transient process analysis of power cut off phase[J]. Electric railway,2008(3):1-4.(in Chinese)
[7]铁路职工岗位培训教材编审委员会. CRH2型动车组机械师[M]. 北京:中国铁道出版社,2009:99-116.
Railway staff training teaching materials editing committee. Type CRH2 motor train unit[M]. Beijing:China Railway Publishing House,2009:99-116.(in Chinese)

备注/Memo

备注/Memo:
收稿日期:2016-09-09.
基金项目:国家自然科学基金(51475246)、江苏省自然科学基金(BK20161019)、江苏省高校自然科学基金(15KJB470011).
通讯联系人:高翔,硕士,实验师,研究方向:电气工程. E-mail:gaoxiang@njnu.edu.cn
更新日期/Last Update: 2017-09-30